Boeing makes the decision to make the next version of the Dreamliner, the 787-10, exclusively at its plant in the North Charleston area of S. Carolina. This is a non-union facility. Larry Loftis, Boeing's vice president and general manager of the 787 program, says the decision was made because it is not practical to ship by air the midbody section of the new plane which is 114 feet long, 10 feet longer than the 787-9. It would not fit into the modified 747 aircraft used to ship jet parts from one manufacturing facility to another. Currently this midbodysection is assembled in S. Carolina from pieces shipped by air from Italian and Japanese plants. Then flown to Everett, Washington or a S. Carolina assembly line for the final steps in the manufacturing process. Reliability and quality issues for the Dreamliner, and cost, are also better addressed by reducing shipment from one manufacturing facility to another. The decision to build this non-union plant in 2009 created strains with the labor unions. The 787-10 is 224 feet long, carries 320 passengers, one third more than the 787-8 and 15% more than the 787-9. It has a list price of 289 million. Boeing has 132 orders from airlines and lessors for this new version....