The Tokyo National Stadium design approved by a 2012 panel headed by architect Tadao Ando, is scrapped by prime minister Abe of Japan. The design was by the firm Hadid Architects in Britain. Public criticism over the cost of the project for the Tokyo Olympics led to its cancellation. The original project cost estimate was 130 billion yen, with the new cost almost double that of 252 billion yen. Surprisingly Tadao Ando says it was not the panel's job to figure out the cost and he did not have any idea what the cost would be when the design was selected. The debt problems in Greece began with the Athens Olympics. And it is widely thought that president Putin spent too much ($47 billion) on the 2014 Sochi Winter Olympics, especially now that Russia's economy is contracting and there is a need for stimulus spending on useful infrastructure.